The Mooring Diagram for the dinghy park for Saturday is available as a PDF (76.7 Kb) on BOX.

Boats which are highlighted need to have an ID number affixed to the starboard bow. Peter Norwood will have stickers. If there is a boat in the spot another has been assigned please move the misplaced boat.

Please bring a rake or shovel and work gloves.

To do list:

  • Alan McClatchy will want to attach his goose lights to the docks
  • Landscape cloth (to be supplied and there is a part roll in the Youth Pavilion) to be applied to rocks along the harbour edge west of the awning
  • Topsoil to be spread (tractor will move bulk but will need raking). Possibly sod to lay west of the Youth Pavilion and on the new area west of the awning
  • There will also be a crew from W-Dock spreading gravel around the new crane. Any help offered them will be appreciated.
  • Dinghy trailers are to be moved to the area between the harbour and the sidewalk north of the new crane
  • General cleanup of garbage including tires (not permitted) and miscellaneous pieces of wood, tarps, derelict equipment boxes etc.
  • Note anything which needs to be repaired or otherwise dealt with.

Enjoy coffee and donuts for the work crew (and lunch if the work extends into the afternoon)

Have fun and wish I could be there!
Mike McEvoy
Fireball CAN 15033
Catalina 30 #860

Similar Posts