All wet-moored boat owners are requested to check bilges under the engine and in the keel sump for contaminant leakage. If there is any sign of contamination, owners must turn their bilge pump OFF until the source of the leak is repaired and the bilge cleaned of contaminants.
Similar Posts
Dinghy Docks take flight!
The inner sections of each Dinghy Dock took flight on Friday afternoon, landing in a nearby parking lot.
Haulout preparation schedule in the Park, Trailer-Launch and Yard (October 15 thru October 22)
Work is already underway in the Yard and Harbour to prepare for Fall and Haulout. There are important milestone dates for Member Boat-Owners in the Harbour, Park and Trailer Launch areas.
Harbour Closing – Nov 12
On Monday, November 12th, several volunteers from the Harbour Committee will close our Harbour for the season.
Water Gauges
With many thanks to Ken Pole, we now have a second water gauge situated on the south wall near the main dock entrance in addition to the one on the east wall near the south crane. The red line indicates datum. Real time water levels are also available on-line; datum is 57.9 m.
Crane Familiarization Session April 30, 11h00
If you plan to use the standing cranes at NSC to launch, haulout or mast your boat, you must have attended a “crane familiarization” session. If you haven’t done so already, signup is done online….
Yard Work Party Saturday April 22 – looking for volunteers
As part of a continuing major effort to clean up the NSC yard, last Saturday a small group of volunteers identified and classified long standing unclaimed items. This Saturday morning at 9:00 the items need to be collected and consolidated and we’re looking for extra hands. If you’re able to help please get in touch with…